Steam, boilers and turbines: high-pressure piping in thermal power plants takes certified welding and rigorous inspection. The critical points to watch.
High temperature, high pressure
Thermal power plants and energy facilities move steam and fluids under high pressure and at high temperature. The high-pressure piping that feeds boilers and turbines does not tolerate close-enough work: full penetration, weld geometry and the absence of defects are critical for safety.
The process is chosen by diameter and wall thickness — generally GTAW for the root pass, FCAW or SMAW for fill.
Preparation, WPS and inspection
Bevel preparation, alignment and adherence to the WPS parameters determine how the joint holds up under pressure. Our ASME IX-qualified welders work heavy-wall carbon steel, and every weld is identified and traced for the inspection and documentation the client requires.
Commissioning and return to production
We prepare the systems for pressure testing and coordinate the required inspections with your team, right up to progressive startup of the equipment. Aligning motors and pumps is part of the job too, to limit vibration and premature wear.
A piping project for a thermal power plant? Get a free quote.
Get Your Free Quote
Tell us about your piping, welding or plant shutdown project. We come back with a clear quote and a clear plan of work.